Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-22-2012: 2.5 hrs



Outboard rib riveted and sealed



Vent line is fabricated


Vent line


Vent line crossing the fuel cap support



Outboard rib rivets are sealed with sealant


Leading edge of the outboard rib is sealed


Vent line fitting is sealed on the inboard rib


Vent line fitting on the inboard rib


Only inboard rib needs to be riveted. But I have to order the vent line fitting sleeve. After that, I need to install the sleeve on the vent line before riveting the inboard rib, otherwise, the sleeve will be difficult to install.

<<Previous |  Home | Next>>


Make a free website with Yola