Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


05-22-2011: 2.5 hrs 

Went to Axsys Inc, a RV builder assistant group for EAA chapter monthly meeting. Took a detailed look at the RV6A, RV10, RV4, and RV12 being built there. Met Dennis and Glen who taught me the basic sheet metal class last year. Great gathering. 

Came back and found some time after some family duty. Take the right elevator apart, started deburring, edge smoothing, and dimpling. My least favorite, but an important part of building.

Did find a new way to dimple the last two holes of the tip rib, results are pretty good.


Make a free website with Yola