Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


05-29-2011: 1 hr 

Only find 1 hr to work on the airplane this morning.


Cleco reinforcement plate to left elevator spar


Reinforcement plates and spar are drilled


Left elevator tip rib and counter balance rib are fluted and drilled together


Tip and counter balance ribs are drilled to left elevator spar


Make a free website with Yola