Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


05-31-2011: 1.5 hrs 


Started clecoing counterbalance skin to tip rib and C.B rib of left elevator


C.B skin and ribs are clecoed


Counterbalance weight is drilled to #12 size, WD-40 is used as lubricant


Skeleton of left elevator is clecoed


Left elevator skin is clecoed to skeleton, left elevator horn is also attached


The holes on root rib and elevator horn don't quite match, need to do some search to figure out how to get it right



Make a free website with Yola