06-06-2011: 0.5 hr

Clecoed the left elevator for riveting


The skin and counterbalance skin will be riveted first using 4 flush head rivets, 2 on each side


The two flush head rivets on the top side


The shop heads of the two flush head rivets on the top side


Left elevator is clecoed for riveting