06-09-2011: 2 hrs




Almost forgot to add some RTV to the left elevator stiffeners. Un-clecoed the bottom surface and add a dab of RTV between the stiffeners at the trailing edge


RTV between stiffeners at the left elevator tip side


Left elevator is riveted together, except on the top flange of the trim spar (Bottom surface in the picture where you can see clecoes are still on)


The last two rivets of the tip rib are riveted using chisel and rivet gun. Not perfect, but should be OK. It is pretty hard to use solid rivets here. You can see some primer is scratched off, I will touch up this area later


MK319BS pop rivets are used for the last 4 holes of the trim spar. I have to drill the hole to 1/8" to use the pop rivets


The rivet locations are marked to close the tab bend.


Viewed from bottom, the tab is not perfectly closed after using two MSP-42 rivets


To prevent any damage due to vibration caused by the big-than-normal gap between tab bend, I decide to add another pop rivet


Shop heads of rivets on bottom flange of trim spar


Shop heads of rivets between trim spar and root rib


Flush heads of rivets between trim spar and root rib