09-08-2011:


 

It is easier to rivet the first 4 inboard ribs this way using off-set riveting set


Manufactured head is on the rib flange side


Shop heads of the rib to front spar rivets, looks ok



11 right wing main ribs are riveted to front spar, 3 to go, will do it tomorrow