Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


09-15-2011:

After rechecking and making sure there is no twist in the wing, I final drilled the main skins on both top and bottom sides. A little tedious, but it's one step closer to a flying RV7.


Both bottom and top skins of right wing are final drilled

Make a free website with Yola