Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-13-2011:

Continued riveting right flap in following sequence:

1) Riveted rib flanges to spar using LP4-3 pop rivets

2) Riveted FL-706A to FL-706B using solid rivets

3) Riveted top skin to spar flange using solid rivet, I had to use rivet gun

4) Riveted outboard rib to skin, except the last two rivets where a squeeze can't reach. I might have to use MK-319-BS rivets 

5) Riveted bottom skin to spar, together with hinge half


The only rivets need to be done is the inboard rib. The drawing called out MK-329-BS for all rivets that attaching the rib to skin. But I can only find 10 MK-319-BS rivets in the inventory, more than 10 are needed. I have find out if I missed something.


Added on 12-14-2011:

I made a mistake again. I should rivet the inboard rib to the skin before closing the spar, when I have access to the rivets. I got confused by the drawing. I thought pop rivets will be used for entire inboard rib. The drawing only calls for 3 pop rivets each side at the trailing edge. No wonder there are only 10 MK-319-BS rivets supplied. I have to do some analysis to see if it is ok to use MK-319-BS rivets for entire rib.


Van's emailed back to me. Per Van's, using MK-319-BS at this location is OK. MK-319-BS is a pretty strong structural rivet.




<<Previous |  Home | Next>>


Make a free website with Yola