12-29-2011: 2 hrs

1) The stick to bellcrank push rods are primed inside and outside, then riveted the rod ends with MSP-42 rivets. They look pretty good.

2) The fuel tank is tested for leak. The balloon stayed inflated for a day, the tank is leak free. I will install it on the wing in the next few days.



Push rod parts are drilled and primed


The second push rod is drilled


Second push rod is done


More picture about the primed push rod parts


Both push rods are done


Right tank #2 leak test, the balloon stayed inflated for 2 days, the tank should be leak free. The tank in the background is my tank #1