12-31-2011: 3.5 hrs

1) The cradle for the wing is complete. It is pretty much the same as the Van's plan, I added four wheels to more mobility

2) The leak free fuel tank is installed to the wing. I used two bolts for each Z bracket for now, all the bolts are tightened to 23 in-lb using a torque wrench. The Screws are used every other hole.