Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


A List of Things I know I need to do

To Do List:

Finishing fuel system (aft firewall)

Terminal block for wing wiring instl

Pitot line disc at wing root

Elevator push rod - stick to bellcrank

Finish riveting aft lower fuselage (a few holes are still open)

Finish riveting rudder stops

Top skin riveting

Tail light wire routing (need be done before top skin riveting)







Make a free website with Yola