Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-12-2012:



The levelness is rechecked after clecoing the top skins

 






Wing twist is checked. The distance shown here is about 1 -10/32" at outboard rib. Note that this measurement is taken at different location from the 01-16-2012.

 
Wing twist is checked. The distance shown here is about 1 -10/32" at outboard rib


<<Previous |  Home | Next>>


Make a free website with Yola