01-16-2013: 6 hrs


Got quite bit done today. Here is the list

1) Deburred, primed and dimpled left bottom skins
2) Drilled and tapped the pitot mast and pitot tube
3) Installed nutplates for inspection panels on all bottom skins


Pitot mast is clamped to bench for drilling


The holes on mast are countersunk for flush head screw. I had to use the deburring tool to do this due to the curved surface, so the finish is not great, but should be ok due the load is small


Pitot tube mounts to the mast perfectly


Nutplate are installed on all bottom skins for inspection panels