Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
01-29-2013: 1.5 hr
Half way through the right outboard bottom skin, it feels easier than doing the left wing.
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola