Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-09-2012: 2.5 hrs

- Fabricated tank to fuselage attaching bracket
- Drilled the bracket and reinforcement plate with inboard rib
- Drilled reinforcement plate with outboard rib
- Drilled cover plate to the inboard rib
- Drilled the nutplate rivet holes for the reinforcement ring and cover plate



Tank to fuselage attachment bracket fabricated


Tank to fuselage bracket drilled


Inboard rib is matched drilled with fuselage attaching bracket


Inboard rib is matched drilled with fuselage attaching bracket


Outboard rib is drilled with the reinforcement plate


Access plate and inboard rib are match drilled



Nutplate rivet holes on the inboard rib are drilled



<<Previous |  Home | Next>>


Make a free website with Yola