Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-24-2013: 3 hrs

Drilled the wing root fairings to final size, together with tank and wing skins. Then spent a lot of time to trim, deburred the wing root fairing.


3/16" gap line is marked


Right wing root fairing is marked for the 3/16" gap line


<<Previous |  Home | Next>>


Make a free website with Yola