Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


02-26-2013: 1.5 hrs

Stick to bellcrank push rods are installed and ajusted today. All is well. I am amazed to see how smooth the operation is.


Straight edge is taped on left wing for aileron alignment


Sticks are held vertical for adjusting the stick to bellcrank push rod length


Straight edge taped on right wing



<<Previous |  Home | Next>>


Make a free website with Yola