Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-27-2012: 2.5 hrs




Stall warner is riveted to leading edge


I started testing the left tank using the test kit from Van's


While testing the tank, I did final check on the alignment of the wing skeleton before riveting top skins. Inboard end picture


Dental floss line is used to check the slack, mid span


Dental floss line is used to check the slack, outboard end


After confirming the straightness of the wing, I started riveting the leading edge to the spar. I used Cherry pop rivets to rivet the leading edge ribs to spar web



<<Previous |  Home | Next>>


Make a free website with Yola