Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-29-2012: 1.5 hrs




Leading edge is riveted to wing


Shop heads of the leading edge to wing spar flange rivets. They look good, the picture is blurry


Top skins are clecoed to the wing


<<Previous |  Home | Next>>


Make a free website with Yola