Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-01-2013: 1.5 hrs

After drilling and clecoing the panel support brackets F7103C to top skin, I final drilled the skin. Then I clamped the F7108 rib assy to firewall. When I remove the top skin, I still need to drill the holes between the rib and firewall.


I ordered and picked up avionics I got from Dynon. I will need more, but will order later


You can see what I ordered


More ...


And more ...


Fuel flow sensor "red cube"


Instrument support angles are clecoed to top skin


Drilled rib flange to center subpanel using angle drill


Drilled


Top skin is drilled


Top skin is also drilled with firewall flange

<<Previous |  Home | Next>>


Make a free website with Yola