Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-03-2014: 1.5 hrs




Manual trim guide is riveted to the cover plate. I used pop rivets here, the plan calls for solid rivets. I have no strength concern here since the guide is lightly loaded


Blue plastic is removed from right wing









<<Previous |  Home| Next>>


Make a free website with Yola