Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
04-03-2014: 1.5 hrs
Manual trim guide is riveted to the cover plate. I used pop rivets here, the plan calls for solid rivets. I have no strength concern here since the guide is lightly loaded
Blue plastic is removed from right wing
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola