Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


03-01-2014: 6 hrs

I started the day by trimming the vertical stab top fairing, then mixed some epoxy to close the open end of the fairing. I used the acetone to thin the left over epoxy mix, and brushed the thinned stuff to cowls to fill the pin holes.

Then I spent some time to install lights on right wingtip. I still need to epoxy the nav attenna though.











<<Previous |  Home| Next>>


Make a free website with Yola