Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-08-2012: 3 hrs




Aileron gap fairing is clecoed for final drill


Aileron gap fairing and flap brace are riveted


Everything look good here


Lots of rivets around the inboard aileron hinge brackets. Shop heads all look good


Outboard aileron hinge bracket area







<<Previous |  Home | Next>>


Make a free website with Yola