04-17-2012: 3 hrs

Continue working on the center bulkhead. Drilled the 5/8" holes for snap bushing, drilled holes on the shear bars, drilled holes on the control column support brackets F633.


Holes are drilled for snap bushing




Some snap bushings have to be trimed to fit


Fit after trimming snap bushing






Shear bars are match drilled and countersunk


I first drilled one hole on one control column mouting bracket, then match drill the other by clamping them together