04-19-2012: 2.5 hrs
Finished the control column mouting brackets, primed and installed. Also have the nutplates installed on the F704B.
Nut plates installed on F704B flanges
More nut plate pictures
Control column mouting brackets installed, bolts are tightened to 24 in-lbs and torque sealed
Everything looks good so far