Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


04-27-2013: 4 hrs



Rudder bushing is secured by clamp


I am not going to use fairing here, this is what it looks, and will fly like this


This is the longer manual trim cable I bought


The center section of the trim knob is cut, and the pin is removed so the cable can only be ajust by twisting the handle


After the push pin is removed, I glued the rubber part back the handle


The cable is disconnected from the handle


The hole is enlarged for trim cable handle


Fuel selector valve is installed with spacers


Elevator trim handle is installed


Onto the spar now


This is how the trim cable routed cross front spar of horizontal stab


The cable exits the rear spar like this


Fuel pump plumbing is done





Another view of the pump tubing, looking good to me



<<Previous |  Home | Next>>

Make a free website with Yola