Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


05-05-2013: 3 hrs

Having been thinking about electrical system for a while, I like simplicity, and already bought the Van's wiring kit. So I will just mostly follow Van's instruction, and modify the routing as needed to fit the SkyView system that I will put in my cockpit.

Just made the terminal block and installed ground studs per instruction today.





I mistakenly drilled through the holes for terminal screw, I used some RVT to plug it for insulation




A grounding stud is made on the subpanel, I cleaned the primer around the stud









<<Previous |  Home | Next>>

Make a free website with Yola