Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


05-16-2013: 1.5 hrs

The keyed ignition switch I ordered from Vans arrived today, so I finished the hole for the switch. They fit well.

Then I drilled all the holes for toggle switched circuit breakers and push style circuit breakers. I have 13 holes on the pilot side, and 11 holes on the passenger side. I may not need all the 11 holes on the right side, I will plug these unused holes later.






<<Previous |  Home| Next>>


Make a free website with Yola