Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


05-18-2013: 3 hrs

Wired the push to talk button on the stick grip, then installed the grip to both sticks. Also started working on the manual aileron trim system













<<Previous |  Home| Next>>

Make a free website with Yola