Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


06-10-2013:  1.5 hrs


Didn't like the crinched rivet between the intercostal attaching bracket and frame, so I decided to drill it out. Wrong decision. I ended up enlarged the hole. I had to use a larger sized pop rivet to fix it. (date on photo is wrong)




<<Previous |  Home| Next>>

Make a free website with Yola