Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


06-23-2013: 4 hrs


Drilled the right side track and rear track. I decided to use 6 fasteners on the right side as well so it is consistent with the left side. After installing the tracks, I fitted the canopy with frame on, the rolling is pretty smooth. The fit looks good to me too. So far so good, hope the rear skirt will fit when time comes.








<<Previous |  Home| Next>>

Make a free website with Yola