Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


07-01-2012: 3 hr

Finally, I got all seat ribs deburred. The asscess rib plates were then fabricated. After that, the fun began. I had F704, seat ribs, F705 and baggage ribs all clecoed. It looks like a serious structure which it is.


All seat ribs are edge deburred


Two center seat ribs are cut to make the top removable for control column installation





These two removable flange are primed


Clecoed back on the rib, the fit is good


Seat ribs are clecoed to the center section


F705 bulkhead and baggage ribs are clecoed



<<Previous |  Home | Next>>


Make a free website with Yola