Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


07-10-2013: 2 hrs


My order for C791 canopy skirt brace is here today, so drilled it to canopy frame today. I broke a #30 drill bit, and two holes on the brace is enlarged because the broken bit walked a little. Since the brace is not really structural part, two slightly large holes for LP4-3 pop rivets won't concern me. I will just build on. However, I have only one #30 bit left, time to order more drill bits.






<<Previous |  Home| Next>>

Make a free website with Yola