Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


07-24-2012: 3 hrs

There are still lots of small tasks to be done before joining the center and aft fuselage together. I trimmed the longerons to length, and trimmed the end per plan. Then I used the upper deck as a template to mark the slot area on the longerons. Also, I had to enlarge the slots on bulkheads so the longerons can slide in freely. After all these, I then slide the longerons onto aft fuselage. The fit is pretty good. 

I then started drilling the F715 end seat rib. I only get the left side done before calling it a day.





Longerons are trimmed



Rails are drilled to the longerons


The bulkhead slot had to be enlarged to allow longeron slide freely


Slots are cut on longerons, fit the aft fuselage well


Another view of the longeron to aft fuselage fit



The longeron fit is good


End seat ribs are drilled


End seat ribs are fluted


The aft fuselage is turned upside down



<<Previous |  Home | Next>>


Make a free website with Yola