Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


08-03-2013: 3 hrs





The copper bar is bolted between master and starter relay


Another view of the copper bar


Wiring conduit on the right side is clamped


Detail at center of bottom firewall


Hole for heater box is cut on firewall


Heat box is installed on firewall


Oil and fuel pressure sensor block is installed on firewall


Close up view of the pressure sensor block


Two fasteners that secure the pressure sensor block




<<Previous |  Home| Next>>

Make a free website with Yola