09-06-2012: 2.5 hrs
Baggage compartment frames are added. Side skin drilled

The hole is enlarged to 7/16" for vent line

The bottom skin to center fuselage is drilled

Side skin is drilled to stifeners and bulkhead

Left side is done as well

Baggage frame is clecoed on
The hole is enlarged to 7/16" for vent line
The bottom skin to center fuselage is drilled
Side skin is drilled to stifeners and bulkhead
Left side is done as well
Baggage frame is clecoed on
<<Previous | Home | Next>>