09-06-2012: 2.5 hrs

Baggage compartment frames are added. Side skin drilled
 

The hole is enlarged to 7/16" for vent line


The bottom skin to center fuselage is drilled


Side skin is drilled to stifeners and bulkhead


Left side is done as well


Baggage frame is clecoed on