Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


09-07-2012: 2 hrs

Drilled
1) End seat ribs to side skins
2) Side skin to F623 rib
3) foreward portion portion of mid to aft fuselage rivets

Had a small edge margin on the bottom flange of F724 when back drilled using F623 rib as a guide. This is a common problem, I will probably use a doubler when riveting them together.

There are still more to drill.
 

The side skin is drilled to F623


The fit between F623 rib and side skin is not perfect at the aft end. I think the fit will be improved if the side skin is dimpled. We will see.


End seat rib is drilled with side skin


Conical bend is drilled


Center/mid fuselage are drilled together


F750 is clecoed to the baggage frame


<<Previous |  Home | Next>>


Make a free website with Yola