Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


09-08-2012: 4 hrs

Almost ready to disassemble the fuselage for deburring. Before that, I went through the fuselage one more time to make sure everything is drilled. I had a few pickups.


The aft row of holes between fwd and aft side skins are drilled


Top flange of F724 is drilled to main longeron


Hole is enlarged to 5/8"


Hole is enlarged to 1" for fuel line


The other side, the gear attaching web underneath is also drilled


The hole should be drilled to 7/16" for vent line on bottom skin, but I accidently drilled it to 1/2". I'll have to add a busing or something similar later when installing the fitting


The other side is drilled to 7/16" correctly


The hole for #10 screw on the fuel tank attaching bracket support is countersunk


The #10 screw fits well


The fuel tank attaching bracket is used to drill the other 3/16" hole






F902 top flange is drilled to longeron


Floor stiffeners are drilled to the firewall attaching brackets

 

<<Previous |  Home | Next>>


Make a free website with Yola