Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-12-2012: 3 hrs



F704 bulkhead and arm rest are riveted to side skin


F704 bulkhead straps are riveted. The one to the longeron might need to be drilled out later for top skin. Only one strap is rived to longeron.






Shop heads of the F704 doubler rivets


Shop heads of arm rest rivets


F704 to side skin rivets are done on the left side



Baggage area frames are clecoed to side skins. I did do this until now.



<<Previous |  Home | Next>>


Make a free website with Yola