Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-13-2013: 1 hr

Worked on the brake line between firewall fitting and left brake caliper. I don't have enough aluminum tube to complete the right side, so it has to wait until I order more tubings. The line rounting is per Van's plan.







<<Previous |  Home| Next>>

Make a free website with Yola