Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-22-2012: 1.5 hrs

Flipped the canoe. Did some wrapping up work:

- Bolted the end seat ribs to F705 bulkhead, torqued and sealed
- Admired the work done so far












Tanker attach bracket screw is torque sealed


End baggage rib is bolted and sealed

<<Previous |  Home | Next>>


Make a free website with Yola