Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-23-2012: 2 hrs

Finished the upper portion of the aft fuselage side skin to bulkhead rivets. These were left open to slide in the longeron. It is time to close them now. I also riveted the side skins to longeron. I had to be careful not to rivet these where top skin will join longerons.





<<Previous |  Home | Next>>


Make a free website with Yola