Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


10-27-2012: 3 hrs

Painted the rails, and riveted the rail and canopy deck together. This has to be done first, otherwise, after deck and rail are riveted to longeron, I just don't see how to rivet the two at the tab because of the very limited space.

I also decided to rivet the aft deck. I can squeez most of the rivets, but there are a few I have to shoot, and I have go by feel because there is no way I can see the buck bar when shooting the gun. I had to drill out one rivet, got the hole enlarged, then I used a longer rivet , set it and put this task behind me. Other than the one I go enlarged hole, all other rivets looked pretty good.


Torqued and sealed these two bolts




Aft deck is riveted


Canopy deck and rail is riveted together first

<<Previous |  Home | Next>>


Make a free website with Yola