10-29-2012: 2.5 hrs

Riveted the F695 gussets tonight, this took a while.

Then I think it is time to rivet the F728 vertical support angle. These rivets can be all squeezed using pneumatic squeezer, easy job.


F695 gussets are riveted


Shop heads look good


Vertical support angle for F706 bulkhead is riveted