Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


12-25-2011:

Finished all dimpling and priming today. Started riveting the left flap together. Because of my knee surgery, I had to do it in 30 min session.


Spar is clamped for dimpling top flange


Me dimpling the spar


FL-706 is riveted to spar, shop heads look good, the three holes attached to the inboard rib are left open for now


Machined head of the rivets


Bottom skin, ribs, and spar are clecoed together after dimpling and priming


Reinforcement plate serves as a shim


Shop head of the rivet attaching rear flange, reinforcement plate to rear spar. They look good.


Reinforcement plate is riveted to the rear spar, I sprayed some primer on it after riveting


FL-706B is riveted to the inboard rib, with nutplate installed





<<Previous |  Home | Next>>


Make a free website with Yola