Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-07-2012:



Ribs are primed




Bottom flange to rear spar rivet holes are dimpled now


Bottom flange of rear spar is dimpled at the rib joint locations


Main ribs are ready to be riveted to the front spar


Riveting the wingwalk ribs


Shop heads look good


Ribs riveted to front spar, rear spar is clecoed


Rear flange of the outboard rib is dimpled for flush head rivets at this location


The outboard main rib is not riveted to the front spar for now



<<Previous |  Home | Next>>


Make a free website with Yola