01-11-2013: 1 hr


Fabricated an angle to join the pitot mount to the rib. Also marked the screw hole positions on pitot mast.



Angle is clampped to the pitot mount


Another view of the clamppled angle


Positions for the screws that mount the pitot to pitot mast are marked. The screw holes have to be at the area with more material


Positions are marked on the mast