Shawn Li's RV-7 Construction Log

  • Home
  • Construction Log by Dates
  • Construction Deviation and Analysis
  • RV-7 In Action
  • Analysis
  • Phase I Log
  • On Going Maintenance
  • Maintenace Info


01-22-2013:  2 hrs

After carefully checking wing before closing up, I started riveting the left bottom skin. It is fairly time consuming, partly because it is hard to reach the inside the wing, and partly I need to use inspection mirror to check shop heads. I will take it easy and not rush it.



Two inboard ribs are done


Shop heads look good



<<Previous |  Home | Next>>


Make a free website with Yola