Shawn Li's RV-7 Construction Log
Home
Construction Log by Dates
Construction Deviation and Analysis
RV-7 In Action
Analysis
Phase I Log
On Going Maintenance
Maintenace Info
02-03-2014: 3 hrs
Snorkel is cut for filtered air bypass (FAB) door
Door attachment flange is drilled to snorkel
Some chopped fiber is mixed with epoxy to fill the gap between the flange and snorkel
Started working on oil filler door on upper cowl. Door is trimmed and drilled
<<Previous
|
Home
|
Next>>
Make a
free website
with
Yola